With this the major construction of the plane is done. I should get the finish kit in the next 2 weeks. Then I begin the detailed portion of the build
Saturday, October 29, 2011
Monday, October 24, 2011
Saturday, October 22, 2011
Finishing Two of the Harder Jobs
I finished two of the harder jobs today. I got the Flapperon brackets built and I got all the stainless steel match drilled and de-burred.
Saturday, October 15, 2011
Building some Brackets
I started working on the flap brackets today. I made four good brackets and sent two to the scrap pile
Everything was going fine until I drilled 3/8 instead of 3/16
These all came out fine though
Everything was going fine until I drilled 3/8 instead of 3/16
These all came out fine though
Sunday, October 9, 2011
Saturday, October 8, 2011
A New Hanger
After several months of waiting I finally have a hanger at KOXR. I am on the waiting list for the airport of my choice, KCMA, but 169 people are ahead of me. KOXR should do for the next 5 years or so.
While I was on the way to my hanger I stopped by the Harbor Freight factory for the parking lot sale. I picked up a little hanger warming gift. A 2HP compressor for $35.
While I was on the way to my hanger I stopped by the Harbor Freight factory for the parking lot sale. I picked up a little hanger warming gift. A 2HP compressor for $35.
Sunday, October 2, 2011
More Wing Work
Finished off the landing light. I put the top panels on and have a little more riveting to do to finish covering the wing
Saturday, October 1, 2011
Finished Skinning the bottom of the Right Wing
I finished skinning the bottom of the right wing. I flipped it over and cut the hole for the landing light