Sunday, September 9, 2012

Finishing up on the loose ends

For the last couple of week I have been going through the Vans checklist

I started the engine and Synced up the carbs
Did a test taxi around the airport
Calibrated the gas tank
Calibrated the Pitot system
Calibrated the Static system
Weighed the plane and calibrated the center of gravity
Applied for and received my registration (N476VT)
Contacted a DAR and sent in all the FAA Forms

At this point I am ready for my inspection.  I'm waiting on the DAR

No comments:

Post a Comment